Top
+91-8708086369
Mon-Sat: 9.00-18.00

Primavera Risk Analysis or Pert master is Single widely software used in the Construction Project risk analysis. It is owned by Oracle corporation. We provide training on the Primavera Risk Analysis covering all the basic as well advance topics of the Primavera Risk Analysis attaching it with the Live Projects. Following are the topics covered in the training

 

  • Importing schedule from Primavera P6, MS Project and MS Excel
  • Scheduling checking for the constraints and assumptions
  • Quick risk analysis as per three-point estimation technique by Montecarlo Simulation.
  • Defining Risk and preparing Risk Register and Risk Matrix
  • Qualitative and Quantitative risk Analysis
  • Reporting of the risk effect on the Schedule and cost using Distribution graph, tornado diagram etc.
  • Developing Pre-mitigated and Post -Mitigated schedule.
  • Analysis of Risk Mitigation plan and its schedule/cost effect on project

Don't hesitate to contact us any time.